Construction Cost Index for collectively built one- or two-dwelling buildings
Wage drift and VAT excluded
| Collectively built one- or two-dwelling buildings | 2025 | 2026 | ||||||
|---|---|---|---|---|---|---|---|---|
| Type of costs | Sep | Apr | May | Jun | Jul | Aug | Sep | |
| Materials | 165.3 | 167.9 | 168.9 | 170.3 | 171.0 | 172.7 | 171.6 | |
| Labour, wage drift excluded | 127.8 | 127.4 | 131.2 | 131.2 | 131.2 | 131.2 | 131.2 | |
| Plant and equipment | 133.5 | 133.6 | 134.0 | 134.0 | 134.0 | 133.7 | 133.7 | |
| Transport, energy | 134.2 | 145.6 | 144.5 | 142.9 | 140.5 | 143.0 | 147.9 | |
| Contractor's other costs | 136.0 | 138.3 | 138.5 | 139.3 | 139.6 | 139.8 | 139.6 | |
| Contractor's costs (1–5) | 144.4 | 146.4 | 148.0 | 148.6 | 148.8 | 149.6 | 149.5 | |
| Clients other costs | 164.0 | 165.9 | 167.2 | 167.6 | 168.0 | 169.2 | 168.9 | |
| Total Construction cost index (1–6) | 148.2 | 150.2 | 151.7 | 152.3 | 152.5 | 153.4 | 153.2 | |