Construction Cost Index for multi-dwelling buildings
Wage drift and VAT excluded
| Multi-dwelling buildings | 2025 | 2026 | ||||||
|---|---|---|---|---|---|---|---|---|
| Type of costs | Apr | Nov | Dec | Jan | Feb | Mar | Apr | |
| Materials | 165.4 | 166.0 | 165.6 | 165.8 | 166.2 | 166.9 | 168.5 | |
| Labour, wage drift excluded | 123.9 | 127.8 | 127.8 | 127.8 | 127.8 | 127.8 | 127.7 | |
| Plant and equipment | 131.9 | 131.6 | 131.6 | 131.6 | 131.8 | 131.8 | 131.8 | |
| Transport, energy | 132.2 | 138.8 | 135.6 | 139.6 | 140.2 | 144.3 | 145.3 | |
| Contractor's other costs | 133.4 | 136.3 | 136.1 | 136.7 | 136.8 | 137.2 | 139.4 | |
| Contractor's costs (1–5) | 143.9 | 146.2 | 145.8 | 146.2 | 146.4 | 147.0 | 148.1 | |
| Clients other costs | 172.5 | 170.3 | 171.0 | 171.7 | 170.9 | 171.3 | 173.4 | |
| Total Construction cost index (1–6) | 149.0 | 150.5 | 150.3 | 150.8 | 150.8 | 151.4 | 152.6 | |