Construction Cost Index for collectively built one- or two-dwelling buildings
Wage drift and VAT excluded
Collectively built one- or two-dwelling buildings | 2024 | 2025 | ||||||
---|---|---|---|---|---|---|---|---|
Type of costs | Aug | Mar | Apr | May | Jun | Jul | Aug | |
Materials | 160.7 | 163.0 | 165.1 | 166.0 | 166.1 | 165.6 | 166.2 | |
Labour, wage drift excluded | 123.5 | 123.6 | 123.6 | 127.8 | 127.8 | 127.8 | 127.8 | |
Plant and equipment | 134.9 | 133.8 | 133.8 | 134.0 | 134.0 | 134.0 | 133.5 | |
Transport, energy | 133.4 | 134.0 | 133.4 | 132.7 | 131.8 | 132.4 | 134.5 | |
Contractor's other costs | 133.4 | 134.3 | 133.7 | 135.5 | 135.7 | 136.1 | 136.4 | |
Contractor's costs (1–5) | 140.8 | 141.9 | 142.6 | 144.5 | 144.5 | 144.4 | 144.8 | |
Clients other costs | 175.7 | 164.2 | 163.6 | 167.1 | 165.8 | 164.5 | 164.5 | |
Total Construction cost index (1–6) | 147.6 | 146.2 | 146.6 | 148.9 | 148.7 | 148.3 | 148.7 |