Construction Cost Index for collectively built one- or two-dwelling buildings
Wage drift and VAT excluded
| Collectively built one- or two-dwelling buildings | 2024 | 2025 | ||||||
|---|---|---|---|---|---|---|---|---|
| Type of costs | Nov | Jun | Jul | Aug | Sep | Oct | Nov | |
| Materials | 159.8 | 166.1 | 165.6 | 166.2 | 165.3 | 165.8 | 165.8 | |
| Labour, wage drift excluded | 123.5 | 127.8 | 127.8 | 127.8 | 127.8 | 127.8 | 127.8 | |
| Plant and equipment | 133.7 | 134.0 | 134.0 | 133.5 | 133.5 | 133.5 | 133.4 | |
| Transport, energy | 135.1 | 131.8 | 132.4 | 134.5 | 134.2 | 135.1 | 136.9 | |
| Contractor's other costs | 133.2 | 135.7 | 136.1 | 136.4 | 136.0 | 136.0 | 136.2 | |
| Contractor's costs (1–5) | 140.5 | 144.5 | 144.4 | 144.8 | 144.4 | 144.7 | 144.8 | |
| Clients other costs | 167.6 | 165.8 | 164.5 | 164.5 | 164.0 | 162.1 | 162.5 | |
| Total Construction cost index (1–6) | 145.8 | 148.7 | 148.3 | 148.7 | 148.2 | 148.1 | 148.2 | |